Model Schedule of Power 2025
Model Schedule of Power 2025
Contents
Latest Schedule of Powers Indian Railways 2025
There are 18 Railway zones; almost all zones are declared in Model Schedule of Power. These zones are Northern Railway, Central Railway, Western Railway, Eastern Railway, North Western, Southern Railway, South Eastern, South Central, West Central, Konkan Railway in India
SOP updated including Amendment no.54 dated 01.06.2025 | Click Here |
Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic & Bold font with underline including Railway Boardâs Correction Slips from time to time in blue color as on 26.11.2025 | Click Here |
Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic & Bold font with underline including Railway Boardâs Correction Slips from time to time in blue color as on 01.09.2025 | Click Here |
Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic & Bold font with underline including Railway Boardâs Correction Slips from time to time in blue color as on 05.03.2025 (Revised Model SOP 2025 : 05-03-2025) | Click Here |
Corrigendum for Constitution of Tender Committee and Accepting Authority for Works Tenders under Annexure-âAâ of Note No.4 of MSOP/2018 Pt.A Works Matters as on 05.03.2025 | Click Here |
Model SOP 2025
Model SOP Indian Railways
A sample table of powers has been released from the Railway Board (revised edition in July 2025) for the first time to bring unity among the delegates across the zones.
Model Schedule of Power (As on 02.01.2025)
Revised Model Schedule of Power 2025 indicating Corrections shown in Red colour, Italic & Bold font with underline including Railway Boardâs Correction Slips from time to time up to 31.12.18 in blue colour.
Indian Railway Model SOP 2025
SOP updated including Amendment no. 49 dated 22.08.2025 | Click Here |
Click Here to Model sop 2025
Model  Schedule of Power (As on 17.12.2025) | |
Revised Model Schedule of Power 2018 Railway Boardâs Correction Slip 1 dated 17.10.2025 | Click Here |
Letter for implementation of Revised Model SOP 2025 / Eastern Railway | Click Here |
Correction Slip no 1 in MSOPÂ /Part âBâ /Medical Matters | Click Here |
Correction regarding Constitution of Tender Committee & Accepting  Authority â  Annexure A for works Contacts  Under  MSOP â  2025 Part A /Works Matters | Click Here |
Correction regarding Constitution of Tender Committee & Accepting  Authority â  Annexure D for works Contacts  Under  MSOP â  2025 Part A /Works Matters | Click Here |
Joint Procedure Order for Procurement through Spot Purchase Committee in MSOP 2025 | Click Here |
It appears you’re referencing the Model Schedule of Powers (SOP) for 2025 within Indian Railways, which is a framework defining delegation of administrative and financial authority across various organizational levels (e.g., Railway Board, zonal heads, DRMs, workshops, divisions, and departments).
đď¸ What Is the Model Schedule of Powers?
- The Model SOP is a governance tool issued by the Railway Board, updated in 2025 with correction slips since, to standardize decision-making authority across the organization
([turn0search4]îturn0search16î). - It outlines tiered powers for approvalsâsuch as works contracts, commercial charges (fares, freight, demurrage), staff claims, concessions, IT expenditures, and medical/stores proceduresâdelegated to different officials and functional heads.
đŻ Key Details & Utility
- Introduced initially in October 2017, the revised Model SOP 2025 brought clarity and uniformity on subjects like:
- Wharfage refunds, demurrage waivers, life/property claims, freight/fare authority limits, to empower Divisional Railway Managers (DRMs) and departmental heads
([turn0search4]îturn0search16î).
- Wharfage refunds, demurrage waivers, life/property claims, freight/fare authority limits, to empower Divisional Railway Managers (DRMs) and departmental heads
đ Is There a âModel Schedule of Power 2025â?
- As of midâ2025, no new version titled âModel Schedule Of Power 2025â has been officially issued by the Railway Board.
- The existing 2025 model SOPâwith its correction slips and updatesâcontinues to be the active guideline used across zones and divisions (~Model SOPâ2025)
([turn0search4]îturn0search16î).
đ Summary Table
Attribute | Detail |
---|---|
Document Name | Model Schedule of Powers (SOP) |
Latest Issued Version | 2018 (with subsequent corrections) |
Purpose | Delegation of financial/admin powers across levels |
Applicability in 2025 | SOPâ2018 still current, no separate 2025 version |
Areas Covered | Contracts, compensation, claims, fares, concessions, etc. |
â What You Can Do Next
- If you work within Indian Railways or require specific powers in areas such as negotiations, staff claims, or financial approvals:
- Refer to Model SOP 2025 and check the applicable correction slips for latest delegated limits.
- If you’re interested in powers allocated to a specific office (e.g. DRM, CGM, DRM Commercial, Workshop Manager), I can help fetch those details.
Would you like an excerpt of power limits for a particular departmentâsuch as refund claims, freight waivers, works contracts, or medical casesâper the Model SOP?