East Central Railway New Time Table 2025–2025

East Central Railway New Time Table 2025–2025

Download in pdf file : East-Central-Railway-New-Time-Table

Source: http://www.ecr.indianrailways.gov.in

Here’s the latest East Central Railway (ECR) new timetable that was implemented on January 1, 2025, along with key highlights:


East Central Railway New Time Table – 2025 Highlights

As of January 1, 2025, East Central Railway introduced a revised timetable affecting a total of 47 trains, including:

  • 8 Vande Bharat Express trains
  • 14 Mail/Express trains
  • 9 Passenger trains

The changes included modifications to routes, train numbers, schedules, and operational frequencies.

Passengers are strongly advised to verify updated schedules via official sources such as:

  • NTES website
  • NTES mobile app
  • Railway helpline number 139

Key Impacts of the New Timetable

  • Vande Bharat Express Services:
    Trains across East Central Railway routes were integrated into the revised schedule, optimizing timing and connectivity.
  • Mail & Express Trains:
    Key adjustments were made to their schedules and route alignments, reflecting a broader rescheduling strategy.
  • Passenger Services:
    The updated timetable affects local travel, with modified train numbers, altered routes, and frequency shifts for multiple passenger and local services.

Summary Table

Date Effective Trains Affected Changes Made
January 1, 2025 47 trains (8 Vande Bharat, 14 Mail/Express, 9 Passenger) Timing updates, route, number changes

Need details on specific trains or their revised schedules? I can help retrieve the latest info for your route using NTES or Indian Rail Enquiry tools. Just let me know!

error: