Kochi Metro Rail Route Map | Kochi Metro Route Map PDF
- Aluva
- Pulinchodu
- Companypady
- Ambattukavu
- Muttom
- Kalamassery
- Cochin University
- Pathadipalam
- Edapally
- Changampuzha Park
- Palarivattom
- JLN Stadium
- Kaloor
- Town Hall
- M.G Road
- Maharaja’s College
- Ernakulam south
- Kadavanthra
- Elamkulam
- Vyttila
- Thaikoodam
- Petta

Kochi Metro Route Map PDF Download – Click Here

Kochi-Metro-Route-Map-PDF-Download

Here’s the Kochi Metro route map, showing the full corridor from Aluva through the city center to Tripunithura Terminal—covering all operational stations.
Kochi Metro Route Overview
Phase I (Operational):
- Route Span: Aluva → Tripunithura Terminal
- Length: Approximately 28 km
- Stations: 25 in total
- Key Stations Include:
Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University (CUSAT), Pathadipalam, Edapally, Changampuzha Park, Palarivattom, JLN Stadium, Kaloor, Town Hall, MG Road, Maharaja’s College, Ernakulam South, Kadavanthra, Elamkulam, Vyttila, Thaikoodam, Petta, Vadakkekotta, SN Junction, Tripunithura Terminal - Completion: Phase I was fully commissioned with Tripunithura Terminal inaugurated in March 2025
Upcoming Expansion (Phase II)
- Route: JLN Stadium → Infopark II (Kakkanad)
- Length: ~11.2 km
- Stations (11): Jawaharlal Nehru Stadium, Palarivattom Junction, Palarivattom Bypass, Chembumukku, Vazhakkala, Padamughal/Kunnumpuram, Kakkanad Junction, Cochin SEZ, Chittethukara, KINFRA/Rajagiri, InfoPark 1 & 2
- Status: Under construction; expected operational by 2026
Planning Stage (Phase III)
- Route Proposal: Extension from Aluva to Angamaly, passing via Kochi Airport
- Status: DPR (Detailed Project Report) for Phase III is being re-tendered due to cost concerns; includes planning for future connectivity beyond areas such as GIFT City
Route Map PDF & Printable Options
An official route map PDF from Kochi Metro is available through KMRL’s project documentation. You can access it via:
- Kochi Metro’s official site or
- Direct technical or project report downloads (e.g., kollekted “Metro Alignment – Phase II” document)
Summary Table
| Phase | Route | Status | Stations |
|---|---|---|---|
| Phase I | Aluva ↔ Tripunithura | Fully Operational | 25 stations |
| Phase II | JLN Stadium → Infopark II | Under Construction | 11 stations |
| Phase III | Aluva → Angamaly (via Airport) | DPR Stage | TBD |
If you’d like a high-resolution PDF of the current route map, or assistance keeping track of upcoming station openings and extensions, I’d be happy to help!
