Mega Block on 02-02-2025
Mega Block on 02-02-2025
Mega Block on 2nd February 2025
Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on 02.02.2025.
BYCULLA-VIDYAVIHAR DN SLOW LINE FROM 11.15 AM TO 3.45 PM.
Dn slow services leaving Byculla from 10.42 am to 3.44 pm will be diverted on Dn fast line between Byculla and Vidyavihar stations halting at Parel, Dadar, Matunga, Sion and Kurla stations and further re-diverted on Dn slow line at Vidyavihar station.
Dn slow services will not available at Chinchpokli, Curry Road and Vidyavihar stations. Passengers of these stations are allowed to travel via Parel, Dadar, Kurla and Ghatkopar stations.
Up fast services leaving Thane from 11.24 am to 3.26 pm will halt at Diva, Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.
Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.49 am to 3.21 pm will halt at Ghatkopar, Vikhroli, Bhandup, Mulund, and Diva stations in addition to their respective scheduled halts and will arrive destination 20 minutes behind schedule.
All slow services arriving and leaving Chhatrapati Shivaji Maharaj Terminus Mumbai between 11.00 am and 5.00 pm will arrive destination 10 minutes behind schedule.
Also Read: Central Railway New AC Train Time Table And Fare Details
KURLA – VASHI UP & DN HARBOUR LINES FROM 11.10 AM TO 3.40 PM.
Dn Harbour line services to Vashi/Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.08 pm will remain suspended.
Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.21 am to 3.00 pm will remain suspended.
However, Special services will run on Chhatrapati Shivaji Maharaj Terminus Mumbai – Kurla and Vashi – Panvel sections during the block period.
Harbour line passengers are permitted to travel via Trans harbour Line and Main Line from 10.00 am to 4.30 pm during block period.
Due to these blocks, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling. They are also requested to avoid travelling on foot board, rooftop of locals and not to board extremely over crowded trains. These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
It appears that Sunday, 2 February 2025 did indeed feature a scheduled Mega Block across parts of Mumbai’s suburban network, specifically affecting Central and Western Railway lines:
Contents
🚧 Mega Block on Sunday, 2 February 2025
🛤 Affected Lines & Duration:
- Central Railway: Up & Down Fast Lines between Matunga and Mulund blocked from 11:30 AM to 3:30 PM – all fast line services diverted to slow tracks during this maintenance window.
- Western Railway: Fast lines between Churchgate and Mumbai Central were similarly taken offline from 10:35 AM to 3:35 PM, with fast locals diverted over slow lines.
📋 Summary Table
Line | Section | Block Time | Effect |
---|---|---|---|
Central Line | Matunga ↔ Mulund (Fast) | 11:30 AM – 3:30 PM | Fast trains diverted to slow lines |
Western Line | Churchgate ↔ Mumbai Central (Fast) | 10:35 AM – 3:35 PM | Fast locals diverted over slow lines |
ℹ️ Key Notes & Commuter Impact
- Most fast local services were rerouted onto slow tracks, which caused minor delays (typically 10–15 minutes) and led to temporary rescheduling for several trains.
- Harbour and Trans-Harbour lines appear unaffected by this particular block, though special local buses may have operated to assist Central/Western line commuters.
- No Western or Harbour daily block was officially reported for that date other than the fast-line maintenance on Western Line.
✅ Planning Ahead
If you’re traveling during Sundays in Winter/Early Summer 2025, consider:
- Checking NTES or official Central/Western Railway updates before travel.
- Avoid fast services during block hours if your journey includes Matunga–Mulund or Churchgate–Mumbai Central.
- Use slow or suburban lines—or temporal alternatives such as BEST buses—if necessary.
Would you like details on mega block schedules for other dates (like April, June, or July 2025)? Or perhaps help identifying alternate routes during those maintenance windows? I’d be happy to assist further.