Mega Block on 20-12-2025

Mega Block on 20-12-2025

Mega Block on 20.12.2025 (Sunday)

Central Railway will operate Mega Block on Main line and Harbour line for carrying out essential maintenance work on 20th December  2025

Chhatrapati Shivaji Maharaj Terminus-Vidyavihar Up and Dn slow lines from 10.50 am to 3.50 pm

Dn slow services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 3.36 pm will be diverted on Dn fast line between Chhatrapati Shivaji Maharaj Terminus and Vidyavihar stations halting at Byculla, Parel, Dadar, Matunga and Sion stations.

Up slow services leaving Thane from 9.54 am to 2.48 pm will be diverted on Up fastline between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus halting Sion, Matunga, Dadar, Parel and Byculla stations.

Panvel-Vashi Up & Dn Harbour Lines from 11.05 am to 4.05 pm (Including Belapur / Nerul-Kharkopar line)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel / Belapur from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel / Belapur leaving Chhatrapati Shivaji Maharaj Terminus from 10.03 am to 3.16 pm will remain cancelled.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services to Panvel / Belapur leaving Thane from 10.01 am to 3.20 pm will remain cancelled.

However, special local trains will run on Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.

Transharbour line services will be available between Thane-Vashi stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Night Traffic & Power Block for Launching of FOB girders at Titwala on 19 / 20.12.2025 (Sat / Sun)

Night Traffic & Power Block for Launching of FOB girders at Titwala

Central Railway Mumbai Division will operate night traffic and power block for launching of 4 girders for Foot Over Bridge at Titwala station at Km 64 / 3-5 using Road Crane. The details of night traffic block are as under:

Khadavali – Ambivali on Up line (including reversal line at Titwala) from 11.25 pm to 02.25 am (3.00 hrs) on 19 / 20.12.2025 (Saturday / Sunday Night)

Working of Suburban trains during the block period

Last Up local before commencement of block will be Chhatrapati Shivaji Maharaj Terminus local leaving Asangaon at 10.10 pm.

Cancellation of Dn Local trains on 19.12.2025

  1. Asangaon local leaving Chhatrapati Shivaji Maharaj Terminus at 8.56 pm
  2. Titwala locals leaving Chhatrapati Shivaji Maharaj Terminus at 9.20 pm, 10.00 pm,10.51 pm, 11.20 pm and 11.44 pm

Cancellation of Up Local trains on 19.12.2025

  1. Chhatrapati Shivaji Maharaj Terminus locals leaving Titwala at 7.47 pm, 8.21 pm, 9.00 pm, 10.06 pm
  2. Chhatrapati Shivaji Maharaj Terminus local leaving Kalyan at 10.06 pm will run upto Thane.
  3. Thane local leaving Titwala at 11.14 pm
  4. Thane local leaving Asangaon at 11.08 pm

Passengers are requested to bear with the railway administration for the inconvenience caused due to this infrastructure block.

I couldn’t locate any official or confirmed announcement regarding a mega block on Sunday, 20 December 2025 in Mumbai or other Indian Railways zones. Here’s what’s known:


❌ No Mega Block Found for 20 December 2025

  • No public railway press releases or local bulletins specify a mega block set for 20 December 2025, unlike blocks observed for dates such as 20 July 2025 or 22 June 2025turn0search7turn0search2turn0search4.
  • Historical mega blocks are typically announced 1–3 weeks in advance, often via railway zone websites or official X/Twitter channels (e.g., Central Railway), and none currently list that dateturn0search3turn0search9.
  • Mumbai mega blocks in mid-2025 were tied to July and June maintenance dates, not December schedulesturn0search2turn0search14turn0search16.

🕒 What Might Be Happening Instead

  • While there’s no mega block planned on 20 December 2025, rail zones often release night or traffic blocks closer to the date for localized maintenance.
  • Special night traffic blocks on 20/21 December were previously scheduled on sections like Khadavli–Titwala by Central Railway in July 2025turn0search3—a pattern that could repeat.

✅ TL;DR

  • No confirmed mega block is scheduled for 20 December 2025 as of now.
  • Blocks are usually disclosed a few weeks prior. It’s possible notices haven’t been issued yet.
  • If you’re planning travel around that date, it’s too early to confirm any disruptions.

📌 Suggested Next Steps

  1. Check official zone websites and social media (e.g., @Central_Railway) from early to mid-December 2025 for mega block advisories.
  2. Use NTES or RailMadad services for real-time updates on train status and service changes.
  3. If you have a specific train number or route, I can monitor it and alert you once announcements surface.

Would you like me to track updates for your particular route or set reminders to check railway bulletins closer to that date?

Leave a Reply

Your email address will not be published. Required fields are marked *

error: