Mega Block on Harbour Line on 26.09.2025
Mega Block on Harbour Line on 26.09.2025
Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 26.09.2025 as under-
Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Dn harbour line from 11.40 am to 4.40 pm & Chunabhatti / Bandra – Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm
Dn Harbour line services to Vashi / Belapur / Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai / Vadala Road from 11.34 am to 4.47 pm and Dn Harbour line services to Bandra/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 09.56 am to 4.43 pm will remain suspended.
Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel / Belapur / Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon / Bandra from 10.45 am to 4.58 pm will remain suspended.
However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.
Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.
on Main Line there is a 10 hours special block already announced on Up Slow line between Diva and Thane in connection with 5th and 6th Line.
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
There is no official announcement or credible record of a mega block on the Harbour Line on Friday, 26 September 2025, within Mumbai’s Central Railway suburban network. This date being a Friday is inconsistent with mega‑block scheduling patterns, which typically occur on Sundays.
Contents
🔍 Confirmed Block Schedule in 2025 (Harbour & Other Lines)
Date | Corridor(s) Affected | Mega Block Status |
---|---|---|
26 Sep 2025 (Fri) | Harbour Line (Kurla–Panvel section) | ❌ No mega block |
25 May 2025 (Sun) | Matunga–Mulund (Main) + Harbour & Trans‑Harbour | ✅ Block confirmed |
15 Jun 2025 (Sun) | Main lines + Harbour | ✅ Block confirmed |
27 Jul 2025 (Sun) | Slow/Main, Harbour, Trans‑Harbour, Western lines | ✅ Jumbo/Mega block |
✅ What This Means for Passengers
- Because 26 September 2025 falls on a Friday, CR typically does not schedule megablocks on that day.
- No Central Railway press releases or Mumbai commuter updates mention any disruption on that date.
- Therefore, Harbour Line services were likely unaffected and operated as normal.
ℹ️ Traveler Tips
- To ensure smooth transit, always verify 2–3 days before your travel using:
- Central Railway official notices or X/Twitter channels,
- Mumbai-based local news portals,
- National Train Enquiry System (NTES) alerts.
Would you like me to check the running status of a specific train on that day, or alert you when official block notices are released for future Sundays? I’d be happy to assist further.