North Eastern Railway (NER) Pink Book

North Eastern Railway (NER) Pink Book

North Eastern Railway (NER) Pink Book – Click Here to Download

1 Western Uttar Pradesh as (Mathura, Kasganj, Farrukhabad, Kanpur etc.). 2 Northern Uttar Pradesh & Awadh as (Kathgodam, Bareilly, Pilibhit, Lakhimpur Kheri Lucknow, Gonda, Ayodhya etc.). 3 All purvanchal region & North western Bihar as (Gorakhpur, Jaunpur, Azamgarh, Varanasi, Allahabad, Mau, Chapra etc.)

Railway Pink Book 2025-22 | Indian Railway Pink Book 2025-22

Rail Budget for Bihar 2025-2025

Allocation of Railway Budget for Bihar for the year 2025-22, for building world-class rail infrastructure.

On Going Railway Projects

  • 57 New Railway Line, Gauge Conversion and Doubling Projects Costing Rs. 74,880 Crore for 5,267 Kilo Meter
  • Total Outlay 2025-22 is Rs. 5,150 Crore
  • Total Budget allocation in 2025-22 is 355% more than the Average of 2009-14.

Note: Projects falling fully and partly in the state

Rail Budget for Uttar Pradesh 2025-2025

Allocation of Railway Budget for Uttar Pradesh for the year 2025-22, for building world-class rail infrastructure.

On Going Railway Projects

  • 83 New Railway Line, Gauge Conversion and Doubling Projects Costing Rs. 96,697 Crore for 7,143 Kilo Meter
  • Total Outlay 2025-22 is Rs. 12,696 Crore
  • Total Budget allocation in 2025-22 is 1,045% more than the Average of 2009-14.

Note: Projects falling fully and partly in the state

Here’s the latest on the North Eastern Railway (NER) Pink Book—a detailed recap of its status and where things currently stand:


What Was the NER Pink Book?

The NER Pink Book is an annual report (historically referred to as the “Pink Book”) that outlined the railway zone’s capital works for the upcoming year—covering infrastructure projects, financial allocations, new line construction, doubling, electrification, rolling stock, signalling, and station development.

Traditionally, Pink Books were released post-budget, with zone-wise breakdowns. The IRCTC portal used to host the NER Pink Book PDF for 2021–22, suggesting older data remains accessible.


Current Status — NER Pink Book for 2025–26

  • The latest NER Pink Book (2025–26) has not been published or made publicly available yet.
  • Indian Railways has shifted from the old Pink Book format to newer zone-wise budget documents, designed to give detailed reporting per zone rather than a single consolidated Pink Book.
  • Even though the document is usually ready at Budget time, it remains unreleased, per user reports expressing frustration over this delay.

What You Can Still Do

Option Description
Check IRCTC Portal The portal still lists Pink Books from past years, like 2025–22.
Contact NER or RTI You may reach out directly or file an RTI to request the latest zone-specific budget report.
Use Past Editions as Reference Older Pink Books can serve as reference points until the latest version is released.

Summary in Brief

  • Yes, the NER Pink Book existed—but the 2025–26 edition is not publicly available yet.
  • Railways is transitioning to new zone-wise budget documentation, which may replace the traditional Pink Book.
  • No clear release date has been announced for the NER report.

Let me know if you’d like help navigating IRCTC, accessing past Pink Books, or reaching out to NER authorities once the latest version is released.

error: