North Western Railways New Time Table 2025-23
North Western Railways New Time Table 2025-23
NWR Salient features of new Time Table 2025 effective from 01.10.2025
New time table from 01 October 2025 – there will be partial change in the timing of trains
A brief description of the changes made in the upcoming new time table – 2025 effective from 01.10.2025 is as follows –
NWR New Time Table 2025-23 PDF Download – New Train Information, Extension of Train, Changes in train terminals, Change in Train Number, Train Diversion, Experimental Stop provided, Change in Arrival and Departure Timings at Terminal Station w.e.f. 01.10.22 and Increase in speed of trains – Click Here
For detailed timetable and stops for all trains, visit www.enquiry.indianrail.gov.in or download the NTES app.
Here’s the updated information on the North Western Railway (NWR) timetable changes and related developments effective January 1, 2025, part of the new national “Trains at a Glance 2025” schedule:
Contents
🕐 Implementation Timeline & Background
- The existing timetable was extended through Dec 31, 2025 following directives from the Railway Board. The revised NWR timetable came into effect from Jan 1, 2025
🔄 Major Changes in the NWR Timetable
🧭 Revised Train Schedules & Speed Enhancements
- Over 160 trains across North Western Railway saw updated timing and speed improvements beginning January 1, 2025
- These changes have improved average speeds for many long-distance services, saving up to 65 minutes per trip in some cases
🚉 Extent of Service Modification
- Train departure or arrival times were modified at numerous stations within NWR divisions (Jaipur, Jodhpur, Bikaner, Ajmer)
- The timetable adjustments affect monthly and weekly express trains, as well as some popular intercity services.
🎯 Speed & Efficiency Goals
- The timetable update aligns with extensive electrification progress, with over 98% of NWR’s broad-gauge network (5,550 rkm) electrified as of August 2025
🔄 Restored & Special Trains
- NWR resumed operation of 27 previously suspended train services in Rajasthan (e.g., Udaipur–SMVDKatra, Bathinda–Jammu Tawi), reinstating them as per their original schedules by May 2025
- In addition, REET examination special trains (e.g., Jaipur–Bharatpur, Jaipur–Gwalior) were introduced in February 2025 to aid student travel
📋 Quick Summary Table
Category | Details |
---|---|
Effective Date | January 1, 2025 |
Service Impact | ~160+ trains across NWR with revised timings |
Time Savings | Up to 65 minutes per route |
Electrification Coverage | ~98% of NWR network (as of Aug 2025) |
Special/Restored Services | REET exam specials; reinstated Rajasthan services |
Train Speed Improvements | Raised average speeds per the TAG revisions |
🧭 What This Means for Passengers
- If traveling from Jan 2025 onwards, don’t rely on pre-2025 schedules—verify train times before booking.
- Check via:
- NTES app or Rail Enquiry
- SMS service 139
- Official Indian Railways/NWR websites
- Common adjustments include earlier or later departures, adjusted intermediate timings, altered stoppages, and sometimes faster route traversal.
🔎 Passenger Tips
- Planning travel between cities like Jaipur, Ajmer, Bikaner, or Jodhpur after Jan 2025? Always re-check train schedules.
- Major express routes, especially long-distance services, are likely optimized—expect slight travel time reductions.
- Consider using the updated Trains At A Glance 2025 timetable online or via reliable travel apps for accurate seat planning and departures.
Would you like help checking the exact updated timetable for a specific train (e.g., Jaipur–Delhi, Jodhpur–Delhi), fare changes, or updated coach layouts? I’d be glad to assist!