Site icon Rail Travels

Railway Budget For Kerala

Railway Budget For Kerala

Rail Budget for Kerala 2025-2025

Allocation of Railway Budget for Kerala for the year 2025-22, for building world-class rail infrastructure.

On Going Railway Projects

Note: Projects falling fully and partly in the state

Also Read: Indian Railway Budget Highlights

Also Read: Railway Pink Book | Indian Railway Pink Book

Also Read: Important New Line, Gauge Conversion, Doubling and Railway Electrification Projects on 2025-24

In Tamil Nadu, 27 on GOING projects costing Rs.30,961 crores over 3,128 kms length falling fully/partly in the state are under different stages of planning / execution.

Some of the projects in Tamil Nadu under the Vision 2025 are:

In Kerala, 9 on GOING projects costing Rs.8,799 crores over 458 kms length falling fully / partly in the stae are under different stages of planning / execution.

Some of the projects in Kerala under the Vision 2025 are:

The Karnataka portion of Southern Railway in Mangalore also got covered in this year’s budget as Kankanadi – Panambur doubling got Rs.40 crores and is targeted for completion by May 2025. Besides this, under Vision 2024 an additional Platform Line, and provision of new 24 coach pit line in lieu of existing 18 coach pit line at Mangalore Central under traffic facility works are in progress and is targeted for completion by March 2025.

General Manager also highlighted that Southern Railway will complete electrification of all the broad gauge route in its jurisdiction by Dec-2025.He pointed out that an allocation of Rs. 146 crores will give a big push for Signal & Telecom Infrastructure. Major works involves setting up of Modern centralised Train Control System in Chennai- Gudur and Chenni – Renigunta route, Train Collision and Avoidance System (TCAS), LTE and Train Management System. He also stated that vistadome coaches will be introduced in the scenic sections which are to be identified.

Focus on Capacity Enhancement : Substantial Outlay for Southern Railway in Budget 2025-22

Indian Railways received the highest ever Plan Capex of Rs.2,15,058 Crores this year with Rs.7,500 Crores from internal resources, Rs.1,00,258 Crores from Extra budgetary resources and Rs.1,07,300 Crores as Gross Budgetary Support.

Budgetary Grant (BG) under various Plan heads

PH No. Plan Head Budget Grant
In Crores
11 New Lines (Construction) 95.00
14 Gauge Conversion 178.01
15 Doubling 1206.04
16 Traffic facilities 10.00
17 Computerisation 22.56
21 Rolling Stock 75.33
22 Leased Assets-Payments of Capital components 1028.02
29 RSW – LC 92.78
30 RSW – ROB/RUB 415.61
31 Track Renewals 679.00
32 Bridge works 215.00
33 S & T Works 146.30
36 OEW Works incl. TRD 58.31
41 Machinery & Plant 26.32
42 Workshops & Sheds 51.43
51 Staff Welfare 51.66
53 Passenger Amenities 224.57
64 OSW Works 72.76
65 TRG / HRD 5.75
71 Stores suspense 981.27
72 Manufacturing suspense 1257.32
73 Miscellaneous advances 0
Total 6893.05

Budget grant for important ongoing works

No Plan Head Section Budget Grant (In Rs. Crores)
1. New Line Madurai – Tuticorin Via Aruppukkottai (143.5 km) 20.00
Rameswaram – Dhanushkodi (17.2 km) 75.00
2. Gauge Conversion Tiruchchirappali – Nagore- Karaikal with extension of Nagapatinam – Velankani – Tiruthuraipandi incl. new material modification of Karaikal – Peralam (23 km) 88.99
Quilon – Tirunelveli – Tiruchendur & Tenkasi – Virudhunagar (357 km) 2.0
Cuddalore – Salem via Vriddhachalam(191 Km) 15.00
Madurai – Bodinayakkanur (90.41 km) 71.01
3. Doubling Kankanadi – Panambur Patch doubling (19 km) 40.00
Tambaram – Chengalpattu – 3rd line GC 60.54
Kuruppanthara – Chingavanam (26.54 Km) 170.00
Ambalapuzha – Harippad (18.13Km) 15.00
Ernakulam – Kumbalam patch doubling (7.71 Km) 10.00
Omalur – Mettur Dam Doubling with Electrification(29.03 Km) 25.50
Kumbalam – Thuravur Patch doubling (15.59 Km) 10.00
Trivandrum – Kanyakumari (86.56 Km) 275.00
Madurai – Maniyachchi – Tuticorin (160 Km) 300.00
Turavur – Ambalapuzha (50 Km) 10.00
Maniyachchi – Nagercoil (102 Km) 200.00
Netravati – Mangalore Central(1.5 Km) 5.00
Salem – Magnesite Jn-Omalur (11 Km) 35.00
Chennai Beach – Chennai Egmore (4.3 Km) 5.00

Budget Grant for important ongoing Eelctrification works:

No. Section Budget Grant (In Rs.Crores)
1 Villupuram – Cuddalore Port – Mayiladuturai – Thanjavur& Mayiladuturai – Thiruvarur 40.00
2 Kollam – Punalur 19.29
3 Shoranur – Mangalore – Panambur 4.12
4 Pollachi – Podanur 4.43
5 Dindigul – Palghat 86.93
6 Tiruchchirapalli – Manamadurai-Virudunagar 76.57
7 Salem – Vridachalam – Cuddalore Port 50.22
8 Virudunagar – Tenkasi Jn 54.45
9 Tiruchchirappalli – Nagapattinam – Karaikkal Port 11.09
10 Sengottai – Tenkasi Jn. – Tirunelveli – Tiruchendur 70.95
11 Madurai – Manamadurai Jn. – Rameswaram 87.76
12 Shoranur – Nilambur 28.14

Important New works sanctioned

Track Renewal Works
Sl.No. Name of the work Allocation Sanctioned
1 PB No.786: Southern Railway Primary Track Renewal namely TRR & TSR (Umbrella work 2025-22) RRSK 205.05
2. PB No.787: Southern Railway Complete Track Renewal (Primary) (Umbrella work 2025-22) RRSK 190.95
3. PB No.788: Southern Railway Through Fastening renewal, Through Ballast renewal, Through Formation Treatment, ISD, TBTR and Through Weld Renewal, etc. (Umbrella work 2025-22) RRSK 338.64
4. PB No.789: Southern Railway Through Turnout Renewal, Removal of SEJs, Glued Joints, etc. (Umbrella work 2025-22) RRSK 318.22
5. PB No.790: Southern Railway Secondary Track Renewal namely CTR, TRR & TSR (Umbrella work 2025-22) RRSK 63.49
Total 1116.35
PH-32 Bridge Works, Tunnel Works and Approaches
6. PB No.844: Southern Railway Replacement of girders / slabs, rehabilitation / strengthening of sub-structure & super-structure, rebuilding of bridges, bridge protection works, instrumentation & monitoring of bridges and additional waterway (Umbrella work 2025-22) RRSK 150.00
PH-36 Other Electrical Works, Including TRD
7. PB No.906 :Southern Railway Replacement / Maintenance works of traction distribution over Indian Railways (Umbrella work 2025-22) RRSK 170.00

Here are the Key Highlights from the Railway Budget 2025–26 focusing on Kerala, showcasing major allocations, safety enhancements, and infrastructure projects tailored to the state:


Railway Budget 2025–26: Kerala Highlights

1. Substantial Budget Allocation

2. Ongoing Projects & Scope

3. Station Redevelopment

4. Safety Enhancements with Kavach

5. Expansion of MEMU Infrastructure

6. Third Track & Doubling Effort

7. Sabarimala Rail Project Gains Momentum

8. Kerala Electrification Status


Summary Table: Railway Budget 2025–26 — Kerala

Area Details
Budget Allocation ₹3,042 cr (Eightfold increase)
Projects in Progress 8 projects over 419 km; total cost ₹12,350 cr
Station Redevelopment 35 stations under Amrit Scheme – ₹2,560 cr
Safety System (Kavach) 531 RKM total; 107 RKM done
MEMU Shed Expansion (Kollam) ₹44.36 cr – capacity increased to 16-car MEMUs
Thiruvananthapuram–Nagercoil Third line survey + ₹1,000 cr doubling
Angamali–Sabarimala Rail Line Land acquisition underway; cost ₹3,421 cr
Electrification 100% completed in Kerala

Let me know if you’d like a deeper dive into any of these projects—like the Sabarimala rail line, MEMU capacity upgrades, or the station redevelopment plans.

Exit mobile version