Special Traffic and Power block on 8.11.2025 at Ambernath

Mega Block on 8-11-2025 (Sunday)

Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 8.11.2025.

Thane-Kalyan Up and Dn fast lines from 10.40 am to 3.40 pm

Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus from 9.37 am to 2.48 pm will be diverted on Dn slow line between Thane and Kalyan stations, halting at all stations between Thane and Kalyan.

Up fast line services leaving Kalyan from 10.26 am to 3.19 pm will be diverted on Up slow line between Kalyan and Thane stations, halting at all stations between Kalyan and Thane, further will be re-diverted on Up fast line at Mulund halting as per respective scheduled halts.

Kurla-Vashi on Up and Dn harbour lines from 11.10 am to 4.10 pm

Dn Harbour line services to Belapur/ Panvel/ Vashi leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.39 pm will remain cancelled.

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/ Belapur/ Vashi from 10.21 am to 3.41 pm will remain cancelled.

However, special trains will run on Chhatrapati Shivaji Maharaj Terminus-Kurla and Vashi-Panvel sections during the block period.

Harbour line passengers are permitted to travel via Trans Harbour Line/ Main Line from 10.00 am to 4.30 pm.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Special Traffic and Power block on 8.11.2025 at Ambernath

Central Railway will operate special traffic and power block for launching of 5 girders for 6 meter wide Foot Over Bridge at Ambernath (Km 59/26A-28) railway station on Kalyan-Karjat section by using 250 Tonne Road crane. The block will be operated on Up and Dn lines from 10.55 hrs to 13.55 hrs on 8.11.2025. Due to this work, the train running pattern will be as under:

Suburban services on Kalyan-Karjat section will remain cancelled during the Block Period

Before the block

Last DN local will leave Kalyan at 10.38 hrs and arrive Karjat at 11.28 hrs.

Last Up local will leave Badlapur at 10.27 hrs towards Kalyan

After the block

First DN local for will leave Kalyan at 14.03 hrs and arrive Ambernath at 14.15 hrs.

First Up local will leave Karjat at 13.27 hrs for Thane.

Passengers are requested to please note and bear with the inconvenience caused due to this block.

I couldn’t find any official notification or media reports indicating that a special traffic and power block is scheduled at Ambernath on November 8, 2025.


❌ What I found

  • Historical records (e.g. 2025) mention occasional traffic and power blocks at Ambernath limits for infrastructure work
  • No credible sources confirm any planned block for 8‑Nov‑2025 in Ambernath.

✅ What You Can Do

  • For the most accurate information, check Central Railway notifications closer to that date.
  • Refer to official portals like the Central Railway / Indian Railways website or CR Mumbai notices.
  • Local train enquiry boards or station announcements might also provide updates on power or traffic blocks in advance.

Would you like me to monitor or check again closer to Nov 2025 for any updates?

Leave a Reply

Your email address will not be published. Required fields are marked *

error: